Skip to main content

Remove a resource from a Project completely from all items at once

There is a function within Estimating that will let you range or replace a resource from all or selected items in a project

Written by Andrei Ene

To remove a single resource from the Project completely:

  1. Open Estimating.

  2. If selecting specific items, select the items first.

  3. In the View window, click Range.

  4. Click All, Bill or Page.

  5. Click Replace.

  6. Locate and select the Resource to be removed.

  7. Click Select.

  8. Select a different Job/Library resource to change to OR to remove completely Select Replace with Nothing.


Did this answer your question?